Trinity School Lewisham, London
600 Place Church of England Secondary School
Client Lewisham Council, Costain PFI
Value £17m
Role: Peter was Project Architect / Delivery Architect from RIBA Stage D to F whilst at Architects Co-Partnership between 2007 and 2012.
Completion 2012
Special Attributes: Breeam Excellence
Best Education Project at the London District Surveyor’s Association Building Excellence Awards 2011
Trinity 600 place Church of England Secondary School, London Borough of Lewisham London, was built as part of the Lewisham Builing Schools for the Future. Build on a very tight urban site and in a conservation area next to Manor House Gardens. The Building achieved Breeam Excellence with 40% renewable energy from Biomas boilers, solar water heating and photovoltaics.
Peter took over the Project Architect Role at RIBA stage D and Initial tasks with others included re-designing key elements to to reduce the building height to achieve Planning Approval. I was involved in ensuring compliance with BRE right to light, Value Engineering the facade and a re-design of the services to comply with BB101, relocation of the plant to basement. Peter the project through detail design and working drawings up to RIBA stage F.